Section C - Electrics
Cab Systems and Lighting
Standard Work Lights
Standard Work Lights
Component Location
Work lights are mounted on the boom, toolbox and
counterweight to provide additional light when required.
Overview
The work lights are operated from a three position rocker
switch in the right hand console.
Wires and Connectors
K Fig 4. Circuits ( T C-128)
When the switch (C113) is in position 1 power supply to the
work lights is isolated (work lights OFF).
24V is supplied by Fuse 24 on the main fuse module (C100
X4) to pin 2 of the switch (C113).
When the switch is in position 2 - a 24V supply exits via pin
3 where is it is distributed to the boom working lights
(C124, C162) and the DECU (C109 J1, pin 1) The DECU
activates warnings if the work lights are ON after 15
seconds if the engine is not running. Power is also
connected to the LED (C147) to allow back lighting and
illumination of the console.
Position 3 of the switch provides power to the same circuits
as position 2 plus supplies 24V to pin 5. Pin 5 is the supply
to the counterweight light (C125).
C113
C018/C125
C129480-C3.eps
Fig 3. Harness connectors C018,C125 and C113
C-127
9813/5100-1
C-127