jcb JS300 Service Manual page 863

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Fig 58.
5
Install the pivot pin and retaining bolt and nuts.
!M
WARNING
Metal Splinters
You can be injured by flying metal splinters when
driving metal pins in or out. Use a soft faced hammer
or copper pin to remove and fit metal pins. Always
wear safety glasses.
INT-3-1-3_2
Fig 59.
E-202
Note: When checking or refitting JS machine pivot pins,
JS07310-C1
the retaining nuts and bolts should not be fastened up tight
to the pivot boss but must have approximately 3mm of play
so that the pin is free from tension.
6
Once the installation is complete, start the engine and
raise the boom fully. Under no load conditions, expel
any trapped air by operating the ram to full stroke in
both directions several times. Check for oil leaks.
JS07320-C1
9813/5100-1
Section E - Hydraulics
Hydraulic Rams
Removal and Replacement
Fig 60.
E-202

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents