jcb JS300 Service Manual page 798

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Dismantling
Note: The part numbers quoted in the following
Dismantling and Assembly procedures relate to the
K Fig 5. ( T E-135)
illustration
1
Plug or tape over the hydraulic ports and thoroughly
clean and dry the motor housing 301/ valve housing
303 assembly.
2
Position and secure the motor on a suitable work
surface with its drive shaft 101 lowermost. Remove
plug 992 and drain the hydraulic fluid.
3
Match mark main housing 301 and valve housing 303
at level A as an aid.
4
Unscrew relief valve 51 from valve housing 303.
Fig 6.
5
Remove securing socket head screws 171 and
remove reverse protection valve sub-assembly 52
from valve housing 303.
6
Remove plug 469 followed by spring 355 and plunger
351.
E-137
7
Remove socket head screws 401 and with the aid of
the pressure from brake spring 712 separate valve
housing 303 from main housing 301.
8
Remove valve plate 131 and O-ring 472 from the
valve housing. Discard the O-ring.
9
Remove brake springs 712 from main housing 301.
9813/5100-1
Section E - Hydraulics
Swing Motor
Dismantling and Assembly
Fig 7.
Fig 8.
E-137

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents