jcb JS300 Service Manual page 344

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Tighten the nuts and bolts after the first 50h of the running-in stage and then every 250h.
Tighten the nuts and bolts, Refer to Table 64.
For the tightening torques of the bolts and nuts not listed, Refer to Table 65.
Tightening Point
Travel motor
1
(1)
Drive sprocket
2
(1)
Idler wheel
3
(1)
Upper (carrier) roller
4
(1)
Lower (track) roller
5
(1)
Track guard
6
(1)
7
Shoe bolt
8
Counterweight
Turntable bearing (under-
9
(1)
carriage)
Turntable bearing (slew
10
(1)
frame)
Slew equipment
11
(1)
Engine (engine mount)
12
(1)
Engine bracket
13
(1)
14
Radiator
Hydraulic pump
15
(1)
Hydraulic oil tank
16
(1)
Fuel tank
17
(1)
Control valve
18
(1)
19
Battery
Rotary coupling
20
(1)
21
Cab
(1) Use JCB Threadlocker and sealer (High Strength) and tighten to the torque listed.
Bolt Diameter (size)
Hex. bolt
Wrench
Tightening
torque
Hex. socket
Wrench
head bolt
Tightening
torque
269
Table 64.
Bolt Diameter
Wrench (mm)
M24
36
M20
30
M16
24
M16
24
M20
30
M20
30
M22
32
M27
41
M24
36
M24
36
M20/M24
30/36
M20
30
M12
19
M16
24
M10
17
M16
24
M16
24
M16
24
M6
10
M12
19
M16
24
Table 65.
M6
M8
(mm)
10
13
(N.m)
12.5
30
(mm)
5
6
(N.m)
15
36
9831/1100-2
Tightening
Torque (N.m)
923
506
330
259
506
506
981-1128
1452
874
874
410/874
290
104
260
60
259
259
259
7
104
196/245
M10
M12
M14
17
19
22
60
104
167
8
10
12
72
125
200
Technical Data
Torque Values
Checking
Torque (N.m)
831
456
297
233
456
456
883-1015
1307
787
787
369/787
261
94
211
54
233
233
233
6
94
176/221
M16
M18
M20
24
27
30
259
506
874
14
16
17
311
-
607
269

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents