jcb JS300 Service Manual page 617

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

readily
visible.
They
corresponding size and matching colour-coded jaws
of the crimp tool to ensure joint security. This tool also
incorporates a ratchet closing mechanism which will
not release until the splice is fully closed to the correct
compression size.
3
With the Butane heater assembly, seal the
K Fig 34. ( T
connection.
a Remove the cap 35-A from the end of the
disposable gas cartridge 35-B.
Fig 34.
b Before assembling the gas cartridge to the
reflector element 36-C, turn the red ring 36-D to
the left, (in the direction of the minus sign marked
on the ring).
Fig 35.
c Position the tube hanging down from inside the
reflector assembly into the hole at the top of the
gas cartridge. Then press the gas cartridge up
into the reflector assembly as far as possible until
the two elements are clasped firmly together.
K Fig 36. ( T
C-192). A click will be heard.
C-192
are
secured
using
the
C-192).
9813/5100-1
Section C - Electrics
Fig 36.
d Turn the small ring 37-E so that the air holes at 37-
F are completely closed.
Fig 37.
e Turn the red ring 38-D to the right (in the direction
of the plus sign) in order to turn on the gas.
Important: Before turning the heater on, make sure that
the cartridge is not hotter than the reflector element. This
may occur if the cartridge is held in the hand for a long
time. The temperature difference between the cartridge
and the reflector element may cause long yellow flames to
appear on ignition.
Harness Systems
Wiring Harness Repair
C-192