jcb JS300 Service Manual page 870

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

6
Fit the heated slipper seal A (approximately 200°C)
into its installation grove B using the insertion jig.
Damage to the surface of the slipper seal cap will
affect its sealing performance. Be careful not to
scratch the surfaces of the seal when installing.
A
B
Fig 81.
7
Fit the second back up ring.
8
Install the two wear rings into their installation
K Fig 82. ( T
grooves
Fig 82.
9
First twist and then fit the two slide rings into their
K Fig 83. ( T
installation groves
E-209
C030940-C1
E-209).
C030950
E-209).
Note: Wear and slide ring slits must not be aligned
K Fig 84. ( T
E-209).
9813/5100-1
Section E - Hydraulics
Hydraulic Rams
Dismantling and Assembly
Fig 83.
Fig 84.
C030960
C030970
E-209

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents