Overload Warning System - jcb JS300 Service Manual

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Check (Operation)
Test the overload warning system as follows:
– Switch on the overload warning system. Refer to
Section 2, Operation, Working With the Excavator
Arm.
– Make sure that the machine instrumentation activates
the applicable overload warning system active
indicators. Refer to Section 2, Operation, Lifting
and Loading, Overload Warning System.
– Attach suitable test load with suitable lifting
equipment. Lift the load 25 -50 mm off the ground.
Refer to Section 2, Operation, Working With the
Excavator Arm.
– Make sure that the overload system warning
indicators operate correctly. Refer to Section 2,
Operation,
Lifting
Warning System.
– Lower the test load and make sure that the overload
warning system indicators re-set correctly.
If the overload warning system does not operate correctly
carry out the necessary procedures to repair it.
Important: DO NOT operate the machine if the overload
warning system is defective.
C-229

Overload Warning System

and
Loading,
Overload
Routine Maintenance Procedures
9813/5100-1
Section C - Electrics
Overload Warning System
C-229

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents