Coupling - jcb JS300 Service Manual

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Assembly
1
Secure the coupling plate/flywheel A to the engine
with bolts B.
Note: The mating faces of the coupling plate/flywheel and
engine must be clean.
2
Position the 4 x aluminium inserts C onto the coupling
plate/flywheel. Ensure the dowels are installed
correctly and the inserts are flush with the coupling/
flywheel. Secure the inserts to the coupling plate/
flywheel with bolts D.
Important: Apply a small amount of grease under head
prior to tightening.
D
Item
Torque Nm (lbf ft)
M10x30
D
50
M10
F
30
E-77

Coupling

G
C
F
M12x20
M12x35
M14x40
120
90
140
M12
M14
M16
50
70
120
9813/5100-1
TE-032
3
Install the cylindrical hub E onto the splined pump
shaft and secure with the bolts F.
Note: The hub must be installed with the recess closest to
the pump.
Note: The hub surface must be flush with the end of the
pump shaft.
Note: The radial aluminium inserts are already installed on
the hub.
4
Push the flexible element G over the aluminium
inserts on the hub.
5
Push the pump and engine assemblies together to
engage the mesh and secure with bolts H.
H
E
x8
B
Fig 37.
Table 2.
M16x50
M18x55
220
300
M20
200
Section E - Hydraulics
Hydraulic Pump/Regulator
A
x10
M20x50
M20x55
600
600
Coupling
T022490-1
E-77