jcb JS300 Service Manual page 753

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Table 6. Port Identification
Item Port Function
56
P2
Pump 1 Feed
57
B6
Travel (R) Forward
58
Pi2
Boom 1/Arm 2 priority Bucket
59
B7
Bucket Close
60
B8
Boom 1 Down
61
prs1 Not Used
62
prs2 Not Used
63
T2
Tank
64
BR1 Tab/Option
65
Tr1
Tank Option
66
AR1 Tab/Option
67
ps2
Negative control (Pump 1)
68
P3
Merged Feed (if fitted)
69
A8
Boom 1 Up
70
A7
Bucket Open
71
A6
Travel (R) Backward
72
DR4 Drain
73
PA
Pressure Switch Upper
74
PT
Pressure Switch Travel
location,K Fig 7. ( T
For port
E-92
E-91).
9813/5100-1
Section E - Hydraulics
Hydraulic Control Valve
Layout
E-92

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents