jcb JS300 Service Manual page 785

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Assembly
Assembly is a reversal of the dismantling sequence.
1
Lubricate spool C, spring E and balls F and K with
clean hydraulic oil.
2
Tighten components to specified torque
Torque Settings ( T
3
Apply JCB Threadseal to accumulator thread G.
Table 3. Torque Settings
Item
Nm
A
4
C
25
G
55
H
15
J
15
Table 4. Hydraulic Connections
Port
Hose Colour
P
White
A
Orange
T1
No Hose
T2
No Colour
B
Orange
B2
White
C1
No Hose
C4
Light Green
C5
Grey
C6
Light Blue
C7
Yellow
C8
Green
C10
No Hose
C11
White
C12
No Hose
C13
No Hose
E-124
K Table 3.
E-124).
Kgf m
lbf ft
0.4
2.9
2.5
18.4
5.6
40.6
1.5
11.1
1.5
11.1
Function
Pilot Pressure 'In'
Swing Brake 'In'
Tank Return
Swing Brake 'Out'
Cab manifold Pressure
Max Flow Control
Travel Speed
Boom Priority
2 Stage MRV
Cushion Off
PSV Main Pump
2
1
3
9813/5100-1
Section E - Hydraulics
Solenoid Valve Block
Dismantling and Assembly
2
1
3
2
1
3
2
1
3
2
1
3
Fig 4.
C034920-1
E-124

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents