Preparing For Travel; General; Preparing For Worksite Travel - jcb JS300 Service Manual

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

General

When you travel on the road or on site there are usually local rules and safety regulations for the machine
travel position.
This publication contains recommendations that may help you meet the requirements of these regulations, they
are not necessarily the applied law.
Make sure that before you travel on site, you and your machine comply with all the relevant local laws - it is
your responsibility.

Preparing for Worksite Travel

1. Start the beacon, if installed.
Refer to: Operation > Preparing for Travel > Beacon (Page 58).
2. Move the cab so that it faces forward over the dozer blade.
Refer to: Operation > Operating Levers/Pedals > Excavator Arm Controls (Page 96).
3. If applicable, lift the dozer blade.
4. Uneven worksite conditions: Lower the boom so that the bucket or attachment is clear of the ground.
A
Beacon
B
150mm
5. Level worksite conditions:
5.1. All machines except the long reach models: fold the attachment as shown, so that the attachment is
a sufficient distance from the ground.
Distance: 500mm
5.2. Long reach machines: install the tracking strut to support the dipper and move the excavator to the
position shown.
57

Preparing for Travel

Figure 45.
B
Figure 46.
9831/1100-2
Preparing for Travel
A
Operation
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents