jcb JS300 Service Manual page 951

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Bucket Ram
1
Prepare the Machine
a Operate the dipper out and lower the boom to set
the bucket on the ground.
Fig 17.
b Make the machine safe, refer to Section E,
Service Procedures.
c Connect a 0 - 400 bar (0 - 6000 lb/in
gauge and adaptor to port TP1 on the hydraulic
pump.
2
Increase MRV Pressure, refer to Section E, Service
Procedures.
3
Start the engine, lower the gate lock lever and run the
engine at minimum no-load speed in the E mode.
4
Pressure Adjustment
a Raise the boom.
b Open the bucket fully and then continue to
operate the control lever at A.
E-290
Hydraulic System Test Procedures
C030150-1
2
) pressure
c The pressure gauge reading (Bucket Open)
should be compared to the technical data at the
start of the section. If it is outside the limits, adjust
the ARV.
d Close the bucket fully and then continue to
operate the control lever, as at B.
e The pressure gauge reading (Bucket Closed)
should be compared to the technical data at the
start of the section. If it is outside the limits, adjust
ARV.
Note: For accurate setting, the pressure should be
adjusted up to the required level. Release lock nut X.
Adjust setting screw Y to indicate a pressure below the
required level and then bring the pressure back up for final
setting. Tighten lock nut X.
5
Restore Original MRV Pressure, refer to Section E,
Service Procedures.
9813/5100-1
Section E - Hydraulics
Auxiliary Relief Valves
A
B
Fig 18.
Fig 19.
C002690-C2
312460-C1
E-290

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents