jcb JS300 Service Manual page 824

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Fig 34.
10
Apply a coat of grease to the nylon ring.
Fig 35.
11
Place
bearing
K Fig 36. ( T E-163)
E-163
C069500
C069510
on
the
pinion
shaft.
12
Using the Stopper Tool and a press, see Service
Tools, Section 1. Push the bearing against the pinion
shaft shoulder.
13
Using suitable lifting equipment, place the gearbox
housing onto the pinion shaft.
9813/5100-1
Section E - Hydraulics
Swing Gearbox
Dismantling and Assembly
Fig 36.
Fig 37.
K Fig 38. ( T E-164)
C069520
C069530
E-163

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents