jcb JS300 Service Manual page 211

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

11. Lift the machine slightly to check the balance of the machine and the installation of the lifting equipment.
If the machine does not lift horizontally, adjust the length of the slings. Proceed slowly and evenly until the
lift is complete.
12. Keep the machine horizontal during the lift. The centre of gravity of the machine is approximately above
the slew centre.
136
9831/1100-2
Operation
Lifting the Machine
136

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents