Routine Maintenance Procedures; Scheduled Tasks - jcb JS300 Service Manual

Tracked excavators - tier 4i isuzu engine
Hide thumbs Also See for JS300:
Table of Contents

Advertisement

Routine Maintenance Procedures

The table below lists the Body and Framework related
Scheduled tasks. The tasks are in addition to the tasks
detailed in Section 2. For details of all applicable
maintenance schedules refer to Section 2.
Item
Doors and locks
Excavator lever and pedal locks
Swing ring pinion and gear teeth
Fit for purpose test
Cab heater/air-conditioning filter
B-47

Scheduled Tasks

Table 3.
Task
Check (Condition)
Check (Operation)
Lubricate
Check (Operation)
Replace
9813/5100-1
Section B - Body and Framework
Note: Maintenance schedules can vary according to
machine operating conditions and environments. Refer to
Section 2.
Refer to
K Check (Condition) ( T B-48)
K Check (Operation) ( T B-49)
K Lubricate ( T B-50)
K Fit For Purpose Test ( T B-51)
K Cab Heater/Air-Conditioning
Filter ( T B-52)
B-47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Js330Js370

Table of Contents