Preliminary Steps; Removing The Defective Ocp Module; Installing The New Ocp Module; Concluding Steps - Fujitsu PRIMERGY RX2540 M4 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX2540 M4:
Table of Contents

Advertisement

Expansion cards and backup units
9.4.3.1

Preliminary steps

"Shutting down the server" on page 55
Ê
"Disconnecting the power cord" on page 56
Ê
"Getting access to the component" on page 58
Ê
Ê If applicable, remove the riser module 1, see section
modules" on page
9.4.3.2

Removing the defective OCP module

Ê Remove the OCP module, see section
page
250. The four bolts remain installed.
9.4.3.3

Installing the new OCP module

Ê Install the OCP module, see section
page
250.
9.4.3.4

Concluding steps

Ê If applicable, install the riser module 1, see section
on page
71.
"Reassembling" on page 63
Ê
"Connecting the power cord" on page 67
Ê
"Switching on the server" on page 70
Ê
Ê Inform the customer about changed WWN and MAC addresses. For more
information, see section
addresses" on page
"Updating the NIC configuration file in a Linux and VMware environment" on
Ê
page 112
"Configuring LAN teaming" on page 119
Ê
252
71.
"Looking for MAC/WWN/GUID and SAS
115.
Upgrade and Maintenance Manual
"Handling riser
"Removing the OCP module" on
"Removing the OCP module" on
"Handling riser modules"
RX2540 M4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents