Fujitsu PRIMERGY RX2540 M4 Upgrade And Maintenance Manual page 377

Hide thumbs Also See for PRIMERGY RX2540 M4:
Table of Contents

Advertisement

CPU 2
Figure 258: Installing the LC device
Ê Hold the complete LC device with both hands, position it onto the CPU
sockets, and align it with the memory slots.
Ê Carefully press down the memory cooling units (see arrows).
Figure 259: Removing the captive screws of the CPUs
Ê Fasten the four captive screws in a crossover pattern (1 to 4) by hand, by
proceeding as follows:
Torque: 1.4 Nm (not used in Japan)
Ê At first, fasten the captive screws 1 and 2 completely.
Ê Fasten the captive screws 3 and 4 completely.
RX2540 M4
Upgrade and Maintenance Manual
Liquid cooling (LC)
CPU 1
377

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents