Expansion cards
6.3.1
Installing expansion cards
Upgrade and Repair Unit
(URU)
Tools: Phillips PH2 / (+) No. 2 screw driver
6.3.1.1
Preliminary steps
Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 54
Ê
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 39
Ê
Ê Remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 40
Ê
"Removing the riser module" on page 41
Ê
108
Upgrade and Maintenance Manual
Hardware: 5 minutes
CX2550 M2