Geely EC718 2009 Workshop Manual page 580

Table of Contents

Advertisement

2-498
Cooling System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
5.
Tighten the water pump retaining bolts according to the
sequence in the graphic.
Torque
Short Water Pump Retaining Bolts: 9 Nm (Metric) 6.7 lb-
ft (US English)
Long Water Pump Retaining Bolts: 11 Nm (Metric) 8.2 lb-
ft (US English)
6.
Install the drive belt.
7.
Fill the engine coolant.
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents