Geely EC718 2009 Workshop Manual page 624

Table of Contents

Advertisement

2-542
Ignition System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
2.
Install cylinder No.2 and No.3 ignition coils, and tighten
the retaining bolts.
Torque: 9 Nm (Metric) 6.7 lb-ft (US English)
FE02-0397b
3.
Connect the cylinder No.1 high pressure damping line.
Note
Confirm the high-pressure damping line is installed
in place, otherwise it will cause a secondary arch
and engine malfunction.
FE02-0391b
4.
Connect the cylinder No.3 high pressure damping line.
Note
Confirm the high-pressure damping line is installed
in place, otherwise it will cause a secondary arch
and engine malfunction.
FE02-0390b
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents