Geely EC718 2009 Workshop Manual page 491

Table of Contents

Advertisement

Engine
Engine Mechanical System JL4G18-D
Installation Procedure:
1.
Install new bolts to the engine flywheel, but do not tighten
at this stage.
Note
Apply adhesive on the bolts.
Adhesive: Thread Locking Sealant.
2.
Install a special tool GL301-021 to prevent the crankshaft
rotating.
3.
Install and tighten the engine flywheel bolts to the
specified torque, according to the sequence in the
graphic.
Torque: 88 Nm (Metric) 65.1 lb-ft (US English)
FE02-0255b
4.
Install the clutch assembly.
5.
Install the gearbox assembly.
2.6.8.18 Crankshaft Replacement
Removal Procedure:
1.
Remove
Replacement.
2.
Remove the gearbox. Refer to
Assembly
3.
Remove the flywheel. Refer to
Replacement.
4.
Remove the crankshaft oil seals.
5.
Remove
2.6.8.14 Cylinder Head Assembly
6.
Remove the oil pump. Refer to
FE02-0256b
Replacement.
7.
Remove the oil pan. Refer to
Replacement.
8.
Remove the piston connecting rod and bearing. Refer to
2.6.8.16 Piston
Replacement.
9.
Remove the oil filter bolts.
the
engine.
Refer
Replacement.
the
cylinder
head
Connecting
EC718/EC718RV EC715/EC715RV 10/2009
2-409
to
2.6.8.13 Engine
3.3.8.3 Transmission
2.6.8.17 Flywheel
cover.
Refer
to
Replacement.
2.9.8.1 Oil Pump
2.9.8.3 Oil Pan
Rod
and
Bearing

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents