Geely EC718 2009 Workshop Manual page 447

Table of Contents

Advertisement

Engine
Engine Mechanical System JL4G18-D
8.
Install the tensioner rail components retaining bolts.
Torque: 19 Nm (Metric) 14 lb-ft (US English)
9.
Install the crankshaft sprocket.
10. Install the timing chain cover and accessories.
EC718/EC718RV EC715/EC715RV 10/2009
2-365

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents