Geely EC718 2009 Workshop Manual page 851

Table of Contents

Advertisement

Engine
ECM Harness Connector EO35
16
15
14
13
73
32
31
30
29
52
51
50
49
48
47
46
45
72
71
70
69
68
67
66
65
Check main relay terminals No.2 and 5 voltage.
Step 5
86
2
J
1
L
87
30
5
85
3
1
2
K
1
I
5 3
5
2
3
1
G
2
Yes
Check main relay terminal No.3.
Step 6
12
11
10
9
8
7
6
5
4
3
2
28
27
26
25
24
23
22
21
20
19
18
44
43
42
41
40
39
38
37
36
35
34
64
63
62
61
60
59
58
57
56
55
54
FE02-5300b
EF17
EF16
EF15
1
G
5 3
2
30
EF14
86
85
F
87
86
E
30
87
87
85
1413 12 11 10
5
3
87
9
8
6
5
7
4
3
2
1
FE02-5301b
(a)
Turn the ignition switch to "ON" position.
(b)
Measure voltage between ECM harness connector EO35
terminal No.3 and a reliable ground.
Standard Value:
Voltage Between EO35 (3) and A Reliable
1
Ground
17
33
(c)
Turn the ignition switch to "OFF" position.
53
Voltage normal?
No
Yes
(a)
Remove the main relay.
(b)
Measure voltage between the main relay terminal No.2,5 and
a reliable ground.
(c)
Measure resistance between the main relay terminal No.2,5
and a reliable ground.
2
3
5
D
Standard Value:
1
2
3
5
C
1
86
B
30
85
86
Voltage Between The Main Relay Terminal
A
30
85
No.2,5 and A Reliable Ground
Resistance Between The Main Relay
Terminal No.2,5 and A Reliable Ground
All normal?
No
Control System JL4G15-D
Test Items
Repair circuit between the battery and EO35
terminal No.3.
Go to step 8
Test Items
Repair battery to the main relay terminal No.
2,5 circuit.
EC718/EC718RV EC715/EC715RV 10/2009
2-769
Specified Value
11-14 V
Standard Value
11-14 V
10 kΩ or higher

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents