Geely EC718 2009 Workshop Manual page 285

Table of Contents

Advertisement

Engine
No
Step 13
Test the cylinder pressure.
No
Step 14
Timing Chain Inspection.
No
Step 15
Install the timing chain.
No
Step 16
Check mechanical parts inside the engine.
Next
Diagnostic completed.
Step 17
2.2.7.46 Idle Speed Reading Procedure
Must carry out this procedure if any of the following occurs:
Disconnect battery cables.
Control System JL4G18-D
System normal
Yes
(a)
Test the cylinder pressure. Refer to the "Engine Mechanical
System" in the.
Standard Cylinder Pressure: 800 kPa
All cylinders compression pressure equal to or higher than the
specified value?
Go to step 16
Yes
(a)
Turn off the ignition switch and remove the ignition key.
(b)
For timing chain inspection. Refer to "Engine Mechanical
System" in
the2.6.8.11 Timing Chain
Is timing chain positioned properly?
Go to step 16
Yes
(a)
Turn off the ignition switch and remove the ignition key.
(b)
Reinstall the timing chain. Refer to "Engine Mechanical
System" in
the2.6.8.10 Timing Chain
Start the engine, fault solved?
System normal
Yes
(a)
Remove the engine.
(b)
Check the mechanical parts inside the engine. If necessary,
repair the damaged parts inside the engine.
(c)
identify the damaged parts repair has been completed.
EC718/EC718RV EC715/EC715RV 10/2009
2-203
Inspection.
Replacement.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents