Geely EC718 2009 Workshop Manual page 486

Table of Contents

Advertisement

2-404
Engine Mechanical System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
3.
With the new engine oil lubricate the cylinder wall.
4.
With the new engine oil lubricate the piston, use universal
tools and wood handle to install cylinder No.1 piston rod
components marked with cylinder No.1 location.
Note
The dot mark on the piston top surface should face
the engine front end. Note that during the installation
process prevent the lower connecting rod hitting the
crankshaft journal, causing damage.
5.
Install the cylinder No.1 connecting rod bearing cap
marked with cylinder No.1 location.
Note
The dot mark on the bearing cap should face the
engine front end.
FE02-0239b
6.
Install and tighten cylinder No.1 connecting rod bearing
cap bolts.
Torque
First Pass: 20 Nm (Metric) 14.8 lb-ft (US English)
Second Pass: 51 Nm (Metric) 37.8 lb-ft (US English)
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents