Geely EC718 2009 Workshop Manual page 434

Table of Contents

Advertisement

2-352
Engine Mechanical System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
2.
Install the timing chain tensioner and tighten the nuts.
Torque: 29 Nm (Metric) 21.5 lb-ft (US English)
3.
Rotate the crankshaft pulley counter clockwise to unlock
the self-locking device and pop up the handle.
Note
Rotating process should be even, otherwise it may
cause the timing chain teeth skidding.
4.
Confirm the tensioner unlocked and the tensioner guide
is firmly pressed by the handle.
Note
If not properly unlocked, use a screwdriver to push
tensioner in the opposite direction to unlock the
guide.
5.
Install the valve chamber cover.
6.
Install the ignition coil.
7.
Install the engine hood.
8.
Connect the battery negative cable.
FE02-0141b
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents