Geely EC718 2009 Workshop Manual page 209

Table of Contents

Advertisement

Engine
3. Schematic:
12
From Battery
4. Diagnostic Steps:
Note
Before carrying out this diagnosis step, observe the data list on scan tool and analyze the accuracy of the data, as
these will help with quick diagnosis.
Initial Inspection
Step 1
Next
Measure the resistance of fuel injector assembly.
Step 2
Main Relay
Cylinder No.1 Fuel Injector
(a)
Control System JL4G18-D
Check the fuel injector wiring harness connector for damage,
poor connection, aging or signs of loosening.
EC718/EC718RV EC715/EC715RV 10/2009
2-127
Engine
Control
Module
FE02-5051b

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents