Geely EC718 2009 Workshop Manual page 628

Table of Contents

Advertisement

2-546
Ignition System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
Installation Procedure:
1.
Install the knock sensor retaining bolts.
Torque: 18 Nm (Metric) 13.3 lb-ft (US English)
2.
Connect the knock sensor wiring harness connector.
3.
Install the starter.
4.
Connect the battery negative cable.
FE02-0405b
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents