Geely EC718 2009 Workshop Manual page 471

Table of Contents

Advertisement

Engine
Engine Mechanical System JL4G18-D
4.
Install the cylinder head gasket bolt washers.
FE02-0197b
5.
Install and tighten the cylinder head bolts, according to the
sequence in the graphic.
Torque:
First Pass: 49 Nm (Metric) 36.3 lb-ft (US English)
Second Pass: 80 Nm (Metric) 59.1 lb-ft (US English)
6.
Install the small cycle pipes to cylinder head retaining
bolts.
FE02-0199b
EC718/EC718RV EC715/EC715RV 10/2009
2-389

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents