Geely EC718 2009 Workshop Manual page 296

Table of Contents

Advertisement

2-214
Control System JL4G18-D
EC718/EC718RV EC715/EC715RV 10/2009
4.
Remove VVT solenoid valve retaining bolts and remove
the VVT solenoid valve.
Installation Procedure:
Note
After replacing the VVT solenoid valve, you must carry
out the "Clean Solenoid Valve Filter" procedure, other it
cause electromagnetic valve damage.
1.
Make sure the new VVT solenoid valve seals are intact.
Apply a small amount of engine oil on the seal.
FE02-0042b
2.
Install the VVT solenoid valve and fasten the retaining
bolts.
Torque: 8 Nm (Metric) 6 lb-ft (US English)
Engine

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec715rv 2009Ec718rv 2009Ec715 2009

Table of Contents