3.6
Commissioning of the "Actuating drive speed" technology application
Note!
Take all the necessary safety precautions before you carry out the following
commissioning steps and switch the device on!
Safety instructions with regard to commissioning
System constellation
8400 StateLine
U V W
M
3~
i
X3/AR
Reference voltage (10 V) for analog signals
X3/A1U
Speed setpoint selection (slider of setpoint potentiometer R)
• Scaling: 10 V ≡ 100 % ≡ 1500 rpm
X3/GA
Ground potential (GND) for analog signals
X4/RFR
Controller enable
X6
Diagnostic interface for connecting the USB diagnostic adapter
[3-1]
Block diagram for wiring the commissioning example for the "Actuating drive speed" application
Commissioning steps
Find a description of the commissioning steps of the "Actuating drive speed" technology
application below.
Please observe the sequence of the steps in the following chapters and follow them
through carefully. This will help you to commission your controller quickly and as safely as
possible:

Prepare controller for commissioning

Creating an »Engineer« project and going online

Parameterising the motor control

Parameterising the application

Firmware ≤ 11.00 - DMS 8.0 EN - 10/2011
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Commissioning of the "Actuating drive speed" technology application
X3
X4
AR A1U GA
24I RFR DI1 DI2
R
W
W
1k ... 10k
( 56)
( 57)
L
8400 StateLine C | Reference manual
( 48)
DI3 DI4
1
(for a 4-pole motor)
( 54)
( 55)
Commissioning
DIAG
X6
X61
X6
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents