Running the Verification Tests
This section provides instructions for starting the installation verification
test, partial test, FRU operational test, and custom test.
To stop a test, disable the robotics by pressing the Robotics Enable
button on the operator panel or by clicking Stop on the Verification
Tests dialog box. Control will be returned to you as soon as the current
command is completed.
The test results appear after the tests complete. The different reports
(Library Report, Drive Report, and Blade Report) will be generated
and viewable in the Reports area of the Verification Tests dialog box.
If a typical user logs on while an administrator is logged on and running
a verification test, testing will continue unaffected. Only one
administrator can be logged on at any given time.
Install Verification Test
When the Install verification test is running, no one else can log on to
the library. The message, "Verification Test is Running," appears in the
Activity area of the main LMC display.
1 Log on as an administrator.
2 Make sure that you are viewing the physical library. From the View
menu, click the name of the physical library.
3 Click Tools > Verification Tests. The Verification Tests dialog box
appears.