Suzuki Intruder VZ1500 Service Manual page 41

Hide thumbs Also See for Intruder VZ1500:
Table of Contents

Advertisement

4) Pour engine coolant up to the radiator inlet.
5) Slowly swing the motorcycle, right and left, to bleed
the air trapped in the cooling circuit.
6) Add engine coolant up to the radiator inlet.
7) Start up the engine and bleed air from the radiator
inlet completely.
8) Add engine coolant up to the radiator inlet.
9) Repeat the 6), 7) procedures until no air bleeds from
the radiator inlet.
10) Close the radiator cap securely.
11) After warming up and cooling down the engine
several times, add the engine coolant up to the full
level of the reservoir.
CAUTION
!
Make sure that the radiator is filled with
engine coolant up to the reservoir full level.
12) Reinstall the removed parts.
Radiator Hose Inspection
Check the radiator hoses for crack, damage or engine
coolant leakage. If any defect is found, replace the
radiator hose with a new one.
I940H1020029-01
Clutch Cable Play Inspection and Adjustment
Inspect clutch cable play
Every 6 000 km (4 000 miles, 12 months)
Inspect and adjust the clutch cable play "a" as follows:
1) Remove the secondary gear case cover and frame
side lower cover. Refer to "Exterior Parts Removal
and Installation in Section 9D (Page 9D-5)".
2) Remove the clutch cable holder (1) with the clutch
cable.
3) Inspect the clutch release arm play "a".
Clutch release arm play "a"
STD: 6.0 mm (0.24 in)
Limit: 2.0 mm (0.08 in)
I940H1020030-01
Maintenance and Lubrication:
1
0B-12
I940H1020031-01
B940H20206015
I940H1020032-01
" a "
I940H1020033-04

Advertisement

Table of Contents
loading

Table of Contents