Water Hose Inspection - Suzuki Intruder VZ1500 Service Manual

Hide thumbs Also See for Intruder VZ1500:
Table of Contents

Advertisement

1F-6 Engine Cooling System:
4) Remove the radiator cover (1).
5) Disconnect the radiator inlet hose (2).
6) Remove the radiator assembly (3) by removing the
bolts.
7) Remove the cooling fan motor (4) from the radiator.
1
I940H1160005-01
2
I940H1160006-03
3
I940H1160007-01
4
I940H1160008-02
Installation
Install the radiator in the reverse order of removal. Pay
attention to the following points:
• Apply thread lock to the cooling fan mounting bolts (1)
and tighten them to the specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
Cooling fan mounting bolt (a): 6.5 N·m (0.65 kgf-
m, 4.5 lbf-ft)
1
(a)
• Connect the radiator hoses securely and tighten the
each clamp screws to the specified torque. Refer to
"Water Hose Routing Diagram (Page 1F-3)".
Tightening torque
Water hose clamp screw : 1.5 N·m (0.15 kgf-m,
1.0 lbf-ft)
• Pour engine coolant. Refer to "Cooling System
Inspection in Section 0B (Page 0B-11)".
• Bleed air from the cooling circuit. Refer to "Cooling
System Inspection in Section 0B (Page 0B-11)".

Water Hose Inspection

Inspect the water hoses in the following procedures:
1) Move the fuel tank backward. Refer to "Fuel Tank
Removal and Installation in Section 1G (Page 1G-
9)".
2) Remove the left frame lower cover and secondary
gear case cover. Refer to "Exterior Parts Removal
and Installation in Section 9D (Page 9D-5)".
3) Check the water hoses for crack, damage or engine
coolant leakage. If any defect is found, replace the
radiator hose with a new one.
1
(a)
1
(a)
I940H1160049-02
B940H21606005

Advertisement

Table of Contents
loading

Table of Contents