Suzuki Intruder VZ1500 Service Manual page 40

Hide thumbs Also See for Intruder VZ1500:
Table of Contents

Advertisement

0B-11 Maintenance and Lubrication:
Throttle Valve Synchronization
Inspect throttle valve synchronization
Initially 1 000 km (600 miles, 2 months) (E-33 only)
and every 12 000 km (7 500 miles, 24 months)
Inspect the throttle valve synchronization periodically.
Refer to "Throttle Valve Synchronization in Section 1D
(Page 1D-18)".
Cooling System Inspection
Inspect cooling system
Every 6 000 km (4 000 miles, 6 months)
Replace engine coolant
Every 2 years
Engine Coolant Level Inspection
1) Keep the motorcycle upright.
2) Remove the frame side lower cover. Refer to
"Exterior Parts Construction in Section 9D (Page 9D-
2)".
3) Check the engine coolant level by observing the full
and lower lines on the engine coolant reservoir tank.
If the level is below the lower line, add engine
coolant to the full line from the engine coolant
reservoir tank filler.
4) Reinstall the frame lower cover. Refer to "Exterior
Parts Removal and Installation in Section 9D
(Page 9D-5)".
Engine Coolant Change
Refer to "Engine Coolant Description in Section 1F
(Page 1F-1)".
WARNING
!
Do not open the radiator cap when the engine
is hot, as you may be injured by escaping hot
liquid or vapor. Engine coolant may be
harmful if swallowed or if it comes in contact
with skin or eyes. If engine coolant gets into
the eyes or in contact with the skin, flush
thoroughly with plenty of water. If swallowed,
induce vomiting and call physician
immediately.
1) Move the fuel tank. Refer to "Fuel Tank Removal and
B940H20206013
2) Remove the radiator cap (1).
B940H20206014
3) Drain engine coolant by disconnecting the radiator
4) Flush the radiator with fresh water if necessary.
F
5) Reconnect the water pump outlet hose.
6) Pour the specified engine coolant up to the
L
7) Bleed air from the cooling circuit.
8) After changing engine coolant, reinstall the removed
I940H1020026-02
Air Bleeding From the Cooling Circuit
1) Support the motorcycle upright with a jack.
2) Move the fuel tank. Refer to "Fuel Tank Removal and
3) Place a rag under the radiator inlet.
Installation in Section 1G (Page 1G-9)".
outlet hose (2).
thermostat connector inlet.
Engine coolant capacity (excluding reservoir)
2 400 ml (2.5/2.1 US/lmp qt)
parts.
Installation in Section 1G (Page 1G-9)".
1
I940H1020027-03
2
I940H1020028-02

Advertisement

Table of Contents
loading

Table of Contents