Suzuki Intruder VZ1500 Service Manual page 224

Hide thumbs Also See for Intruder VZ1500:
Table of Contents

Advertisement

1D-35 Engine Mechanical:
Camshaft / Cam Chain
• Turn the crankshaft clockwise and align the "R I T" line
"A" on the generator with the index marks "B" of the
timing inspection hole.
CAUTION
!
• Pull the cam chain upward, or the chain
will be caught between crankcase and cam
drive sprocket.
• To adjust the camshaft timing correctly, be
sure to align "R I T" line "A" with the index
mark "B" and hold this position when
installing the camshafts.
Front
I940H1140093-02
Rear
I940H1140094-03
"A"
"B"
I940H1140095-01
• Install the C-rings.
• The camshafts are identified by the embossed letters.
Front (#2)
Rear (#1)
• Before replacing the camshafts on cylinder head,
apply molybdenum oil solution to their journals and
cam faces.
• Apply molybdenum oil solution to the camshaft journal
holders.
M/O: Molybdenum oil (MOLYBDENUM OIL
SOLUTION)
I940H1140096-01
I.D. mark
A
B
Rear
I940H1140097-01
Front
I940H1140098-01

Advertisement

Table of Contents
loading

Table of Contents