SSANGYONG 2004 Rexton 2.7XDi Workshop Manual page 1676

Table of Contents

Advertisement

11C-62
applied
Section B-B
Adhesive applying
device
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN
Y220_11C152
Tailgate
Dam
panel
Primer
Section A-A
Priming container
Tailgate glass
Section C-C
Y220_11C153
Section A-A
Section B-B
Tailgate
glass
Section C-C
Y220_11C154
4. Attach the dual-lock (1) to the tailgate glass and install
the glass dam.
5. Apply the primer to the tailgate glass.
• Completely mix the primer before using (over 10
minutes, no deposit).
• Be careful not to flow down the primer. It may
contaminate the vehicle body.
• Curing time after applied: 1 minutes to 24 hours
(reapply after 24 hours)
• Do not use the primer with deposit or floating matters.
• Dispose the out of available period primer (90 days).
• Distribute the primer evenly on the glass surface.
6. Apply the glass adhesive to the tailgate glass.
• Turn over the tailgate glass and start to apply the
glass adhesive at 200 mm from the right bottom
corner.
• If the adhesive bead is not constant and the applied
volume and height is not even, it may cause the
waterleaks.
EXTERIOR
REXTON SM - 2004.4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents