Audi A8 2003 Workshop Manual page 207

Hide thumbs Also See for A8 2003:
Table of Contents

Advertisement

8-cylinder TDI engine (4.2 ltr. 4-valve common rail), mechanics - Edition 12.2013
Note
Note the use-by date of the sealant.
– Cut off tube nozzle at front marking (diameter of nozzle ap‐
prox. 1.5 mm).
– Apply beads of sealant -arrows- onto clean sealing surface of
sump (top section) as illustrated.
The grooves -arrows- on the sealing surfaces must be com‐
pletely filled with sealant.
The beads of sealant must project 1.5 ... 2.0 mm above the
sealing surface.
Protected by copyright. Copying for private or commercial purposes, in part or in whole, is not
Note
permitted unless authorised by AUDI AG. AUDI AG does not guarantee or accept any liability
with respect to the correctness of information in this document. Copyright by AUDI AG.
The sealant beads must not be thicker than specified, other‐
wise excess sealant could enter the sump and clog the strainer
in the oil pump.
The sump (top section) must be installed within 5 minutes after
applying sealant.
– Apply a small amount of sealant to O-rings
⇒ Item 10 (page 198)
into grooves on cylinder block.
and
⇒ Item 11 (page 198)
and fit O-rings
1. Removing and installing parts of lubrication system
Audi A8 2003 ➤
201

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents