Out/Up Pressure Test - Mercury BRAVO Service Manual

Sterndrives
Hide thumbs Also See for BRAVO:
Table of Contents

Advertisement

OILDYNE TRIM PUMP

OUT/UP Pressure Test

NOTE: The numbers in parentheses, e.g. (3), refer to the trim pump hydraulic system dia-
gram on page 5A-11.
1. Leave valve "A" open and close valve "B."
2. Run pump OUT/UP while observing the gauge. The reading should be 2200-2600 psi.
Page 5A-8
(15173-17932 kPa).
If gauge reading is within specifications, proceed to step 3.
If gauge reading is not within specifications, perform the following:
Replace UP Pressure Release Valve
Replace UP Pressure Release Valve
(3) and Retest
Reading NOT OK
Replace Thermal Relief Valve (4) and
Replace Thermal Relief Valve (4) and
Retest
Reading NOT OK
Replace Adaptor (2)
SERVICE MANUAL NUMBER 28
Proceed to
Proceed to
Reading OK
Proceed to
Proceed to
Reading OK
90-863160 MAY 2000
Step 3
Step 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

90-863160

Table of Contents