Dual Installations With Steering Cable Attached To Port Power Package - Mercury BRAVO Service Manual

Sterndrives
Hide thumbs Also See for BRAVO:
Table of Contents

Advertisement

POWER STEERING
5. Attach tie bar end using clevis pin (f), and cotter pin (g).
6. Spread cotter pin ends.
7. Apply Loctite 277 to exposed tie bar threads.
8. Tighten locknut against tie bar to 50 lb-ft (68 Nm).

DUAL INSTALLATIONS WITH STEERING CABLE ATTACHED TO PORT POWER PACKAGE

1. Attach fixed bar end to steering lever, using clevis pin and cotter pin. Spread cotter pin
2. Position sterndrive units as desired and turn adjustable end out (if necessary) to align
3. Turn adjustable end out 3 to 4 turns from this position.
4. Apply Loctite 271 to exposed tie bar threads.
5. Turn tie bar back in (3 to 4 turns) to previously aligned position.
6. Attach tie bar end using clevis pin and cotter pin.
Page 6A-36
e -
Adjustable End
f -
Clevis Pin
g -
Cotter Pin
h -
Locknut
ends.
b
a -
Fixed Bar End
b -
Steering Lever
c -
Clevis Pin
d -
Cotter Pin
hole in bar end with holes in steering lever and piston rod end clevis.
g
c
a
d
22211
SERVICE MANUAL NUMBER 28
h
e
f
22079
90-863160 MAY 2000
22079
22211

Advertisement

Table of Contents
loading

This manual is also suitable for:

90-863160

Table of Contents