SERVICE MANUAL NUMBER 28
Selection
For Dual Installations with Steering Cable Attached to Starboard Power Package
Installation
DUAL INSTALLATIONS WITH STEERING CABLE ATTACHED TO STARBOARD POWER PACKAGE
1. Attach fixed bar end to steering lever, using clevis pin and cotter pin. Spread cotter pin
2. Position sterndrive units as desired and turn adjustable end out (if necessary) to align
3. Turn adjustable end out 3 to 4 turns from this position.
4. Apply Loctite 277 to exposed tie bar threads; then turn tie bar back in (3 to 4 turns) to
90-863160 MAY 2000
* 16" to 30"
* 30" to 46"
46" to 62"
* If centerline distance is the same as maximum figure, use next larger size tie bar.
For Dual Installations with Steering Cable Attached to Port Power Package
* 28" to 37-1/2"
* 37-1/2" to 55"
55" to 72"
* If centerline distance is the same as maximum figure, use next larger size tie bar.
ends.
a
a -
Fixed End
b -
Steering Lever
c -
Clevis Pin
d -
Cotter Pin
hole in bar end with holes in steering lever and piston rod end clevis.
previously aligned position.
TIE BAR CHART
TIE BAR CHART
b
c
d
22079
POWER STEERING
92020A1
92020A2
92020A3
96708A4
96708A5
96708A6
22211
Page 6A-35