Honda MUV700 big red Service Manual page 468

Table of Contents

Advertisement

FRONT DRIVING MECHANISM
Pack the outboard joint with 35
-
55 9 of the
sped-
fied
grease.
SPECIFIED
GREASE:
NKG708 (Kvodo Vushi)
Install the following:
-
outboard
boot
-
new shaft boot bands
-
inboard boot
Do not lighten the bands at
this time.
Install the
bearing
with
the
small
D.D.
facing the
drive shaft.
Install the snap
ring
with the chamfered side
facing
the bearing
.
The shaft 0.0 of
Pack the inboard joint with 60
-
809 of the specified
the lefllnboard
JOint
grease.
IS
larger than lhe
fight inboard Jomt.
Do
not mterchange
them
.
19-10
SPECIFIED
GREASE:
NKG708
(Kyodo
Yushi)
Inslall
the
inboard
joint over the bearing.
Install the stopper ring into
the
groove in the
inboard joint
properly.
Install the boot over the inboard joint securely.
Adjust
the length
of the drive shaft
to
the figu re
given below.
DRIVE SHAFT
LENGTH:
Left:
582 mm (22.9 in)
Right:
486 mm
(19.1
in)
NKG708
(60
-80

Advertisement

Table of Contents
loading

Table of Contents