Power Unit
2
5-70
20) Installing Needle Bearing and
1.
1
2.
3
3
3
3
Pistons
CAUTION
Make sure that the piston, piston pin and
needle
bearing
combination.
Installation of Piston Rings
Complete 2nd piston first.
When attaching a piston ring, face the side of the
ring marked with "T" upward 1.
Bring piston ring gap to knock pin 2.
Installation of needle bearing
Check that the quantity of needle bearing 25
pieces, before assembling.
1) Apply grease to special tool 3, and then attach needle
bearing. When in this procedure, need not attach all of
needle bearing.
Roller Setting Piece 3 :
P/N. 3LC-72216-0
GB
in
their
original
2st X50D2 2011