Download Print this page

Break-In Operation; Test Run; Checks After Test Run - TOHATSU MX 50D2 Service Manual

Hide thumbs Also See for MX 50D2:

Advertisement

Service Information
Break-In Operatio•••10 Hours
Time
Method of break-
in operation
1
1 High Tension Cable
1-24
0
10 minutes
Throttle Opening: 1/2 of
Trolling or idling
WOT at approximately
3,000 r/min
Run at the lowest speed.

5. Break-In Operation

Break-in operation is needed for the purpose of
smoothening sliding surfaces between components such
as pistons, piston rings, piston pins, cylinder, and gears.
2 hours
3 hours
Throttle Opening: 3/4 of
WOT at approximately
4,000 r/min
▽Running at WOT for one
minute every 10 minutes is
acceptable.

6. Test Run

1.
Start engine and check if gear shift can be made
smoothly.
2.
After warming up the engine, read tachometer to check
idling engine speeds specified below.
Idling Speed :- Neutral
RPM
950 r/min
Tachometer :
P/N. 3AC-99010-0
3.
Shift gear into forward (F) and at idle slow for
approximately 10 minutes.
Trolling Speed :- Shift in
RPM
750 r/min
4.
Run at 3,000 r/min or half of WOT for initial 2 hours, then
at 4,000r/min or 3/4 of WOT for 1 hour.
5.
Check that shifting into reverse (R) will not tilt up outboard
motor and allow water to run into boat.
Complete test run during break-in operation.

7. Checks After Test Run

1.
Check that no water is present in gear oil.
Gear oil turns to creamy white if mixed with water
invading into gear case.
2.
Check that no fuel leaks in the cowl.
3.
Check that no oil and water leak in the cowl and no water
is present in engine oil.
4.
After test run, use flushing kit or flushing attachment and
fresh water to wash cooling water path by idling engine.
10 hours
Throttle Opening: 3/4 of
Regular operation
WOT at approximately
4,000 r/min
Running at WOT for short
period is acceptable.
GB
2st 50D2 2011

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Mwx50d2