Download Print this page

Installing Electric Parts; Installing Flywheel - TOHATSU MX 50D2 Service Manual

Hide thumbs Also See for MX 50D2:

Advertisement

Power Unit
1342
1342
342
1342
1342
342
5-92

30) Installing Electric Parts

1.
As for the installation of the following part, refer to the step
of their removal.
• Ground wire
• Electric box
• Starter lock cable
• CD unit
• Ignition coil and ground wire
• Spark plug
Attach coil plate ass'y 1 to power unit, and tighten
2.
mounting screw.
1
1

31) Installing Flywheel

1.
Attach key and flywheel to crank shaft, and tighten the nut
1
1
to specified torque.
2
2
Spark plug:
27 N · m (20 lb · ft) [2.7 kgf · m]
Connect ground wire their original connecter.
· When reusing coil ass'y mounting screw, apply
screw lock #1342.
· Connect coil plate ass'y wire and ignition coil
wire to CD unit.
1342
1342
1342
CAUTION
Use 25mm long bolts 2 for removing.
Otherwise coil may be damaged and can
short.
Flywheel Puller Kit 1 :
P/N. 3T1-72211-0
Flywheel Nut:
100 N · m (72 lb · ft) [10 kgf · m]
Degrease tapered areas of crank shaft and
flywheel before installing them.
GB
2st X50D2 2011

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Mwx50d2
Save PDF