ABB IRB 760 Series Product Manual page 318

Hide thumbs Also See for IRB 760 Series:
Table of Contents

Advertisement

4 Repair
4.7.1 Replacing the axis 1 gearbox
Continued
Removal, gearbox axis 1
Use this procedure to remove gearbox, axis 1.
1
2
3
4
Continues on next page
318
Action
If the robot is to be calibrated with refer-
ence calibration:
Find previous reference values for the axis
or create new reference values. These val-
ues are to be used after the repair proced-
ure is completed, for calibration of the ro-
bot.
If no previous reference values exist, and
no new reference values can be created,
then reference calibration is not possible.
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Action
Decide which calibration routine to use, and
take actions accordingly prior to beginning
the repair procedure.
Move the robot to its most stable position,
shown in the figure to the right.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
Drain the axis 1 gearbox.
© Copyright 2011-2018 ABB. All rights reserved.
Note
Follow the instructions given in the refer-
ence calibration routine on the FlexPendant
to create reference values.
Creating new values requires possibility to
move the robot.
Read more about reference calibration for
Axis Calibration in
Reference calibration
routine on page
361.
Read more about reference calibration for
Pendulum Calibration in Operating manu-
al - Calibration Pendulum.
Note
xx1000001093
See
Changing oil, axis-1 gearbox on
page
126.
Product manual - IRB 760
3HAC039838-001 Revision: M

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 760-450/3.2

Table of Contents