ABB IRB 760 Series Product Manual page 307

Hide thumbs Also See for IRB 760 Series:
Table of Contents

Advertisement

13
14
15
16
17
Product manual - IRB 760
3HAC039838-001 Revision: M
Action
Refit the cable gland cover at the cable exit with
its two attachment screws.
Note
Use a new gasket!
Refit the motor cover with its attachment screws
and washers.
Note
Make sure the cover is tightly sealed!
Remove the lock screw from the hole for lock
screw.
Perform a leak-down test of the axis 2 or 3
gearbox.
Refill the gearbox with oil.
© Copyright 2011-2018 ABB. All rights reserved.
4.6.2 Replacing motors, axes 2 and 3
Note
xx1000001103
xx1000001102
xx1000001101
See section
Performing a leak-down
test on page
146.
See section
Changing oil, gearbox
axes 2 and 3 on page
Continues on next page
4 Repair
Continued
129.
307

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 760-450/3.2

Table of Contents