ABB IRB 760 Series Product Manual page 314

Hide thumbs Also See for IRB 760 Series:
Table of Contents

Advertisement

4 Repair
4.6.3 Replacing motor, axis 6
Continued
5
6
7
8
9
10
11
12
Continues on next page
314
Action
Remove the guide pins.
Apply locking liquid (Loctite 243) on the attach-
ment screws.
Secure the motor with its four attachment
screws and washers.
Reused screws may be used, providing they
are lubricated as detailed in section
on page 385
before fitting.
Disconnect the brake release voltage.
Perform a leak-down test of the axis 6 gearbox.
Reconnect all connectors in motor axis 6.
Refit the connections to the UL lamp, if the ro-
bot is equipped with one.
Check the gasket. If damaged, replace it.
© Copyright 2011-2018 ABB. All rights reserved.
Information
Screw joints
xx1000001012
Washers:
8.4x16x1.6 quality Steel-A2F
Attachment screws:
M10 x 40 quality 8.8-A2F
Tightening torque:
50 Nm
See section
test on page
Connect in accordance with markings
on connectors.
xx1000001224
Product manual - IRB 760
3HAC039838-001 Revision: M
Performing a leak-down
146.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 760-450/3.2

Table of Contents