Mazda 2002 6 Workshop Manual page 587

Hide thumbs Also See for 2002 6:
Table of Contents

Advertisement

Mounting Rubber Assembly Note
1. Apply soapy water to the rubber part of the mounting rubber.
2. Press the mounting rubber until the mounting
rubber end comes out completely from the gear
housing using the SSTs and a press.
3. Reverse the gear housing, then press the
mounting rubber until the mounting rubber end
comes out completely from the other side. At this
time, mounting rubber end and steel pipe are
aligned.
Oil Seal, Inner Guide Assembly Note
1. Install a new O-ring and a new seal ring to the rack's piston.
2. After installing the seal ring, seat it properly at the piston circumference.
3. Apply grease to a new oil seal and inner guide.
4. Install the oil seal to the SST.
N–18
ENGINE SPEED SENSING POWER STEERING
A6E0612W087
A6E0612W088
A6E0612W048

Advertisement

Table of Contents
loading

Table of Contents