Oil Cooler Flushing - Mazda 2002 6 Workshop Manual

Hide thumbs Also See for 2002 6:
Table of Contents

Advertisement

2. Install the control valve body component.
Tightening torque
7.8—10.8 N·m
{80—110 kgf·cm, 70—95 in·lbf}
Bolt length (measured from below the head)
B: 40 mm {1.575 in}
No mark: 70 mm {2.756 in}
3. Install the oil strainer.
4. Match the harness colors, then connect the
solenoid connector and TFT sensor connector.
Spring
Pressure control solenoid
Shift solenoid A
Shift solenoid B
Shift solenoid C
Shift solenoid D
Shift solenoid E
5. Install the ground.
Tightening torque
7.8—10.8 N·m {80—110 kgf·cm, 70—95
in·lbf}
6. Apply a light coat of silicon sealant to the contact
surfaces of the oil pan and transaxle case.
7. Install the oil pan.
Tightening torque
6—8 N·m {62—81 kgf·cm, 53—70 in·lbf}
8. Install the crossmember. (See
CROSSMEMBER
REMOVAL/INSTALLATION.)
9. Install the front tires and splash shield.
10. Install the under cover.
11. Connect the negative battery cable.
12. Add ATF and with the engine idling, inspect the
ATF level. (See
K–13 AUTOMATIC TRANSAXLE
FLUID (ATF)
REPLACEMENT.)
13. Carry out the mechanical system test. (See
14. Carry out the road test. (See
End Of Sie

OIL COOLER FLUSHING

Note
• The contaminated cooler line (oil pipes and hoses) and auxiliary cooler must be flushed completely when
ATX is overhauled or replaced.
K–36
AUTOMATIC TRANSAXLE
Color of connector
(harness side)
Black
White
Blue
Green
white
Black
R–23 FRONT
K–6 MECHANICAL SYSTEM
K–9 ROAD
TEST.)
TEST.)
A6E5614W062
A6E5614W063
A6E5614W064
A6E561419900W01

Advertisement

Table of Contents
loading

Table of Contents